The client required that all primary and secondary beams were EXACTLY
600mm deep. The secondary beams were ex 457x152x52kg/m, with a 10mm pre camber.
The primary beams were simply 610x229x101kg/m UB with profiled cells.
Fabricator: Bone Steel Ltd
Engineer: BSC.P Leeds
Span: 12m x 6m grid
Beam: 600 x 152 x 52kg/m